Maintenance best practice
How preventive maintenance reduces downtime
Why planned maintenance prevents breakdowns, what a working PPM programme needs, the common pitfalls and how to measure whether it is working.
· 6 min read
Equipment rarely fails without warning. Filters clog, belts wear, refrigerant leaks slowly and bearings start to run hot long before something stops. Preventive maintenance is the practice of checking and servicing equipment on a schedule so that this kind of wear is found and fixed while it is still small.
Three ways to maintain equipment
- Reactive (run to failure): fix it when it breaks. Simple, but every failure is unplanned, and some are expensive or disruptive.
- Preventive: inspect and service at set intervals of time or usage, whether or not anything looks wrong.
- Predictive (condition-based): monitor the condition of the equipment and act when measurements show it is drifting.
Most teams use a mix. Preventive maintenance is usually the first step away from purely reactive work, and the readings collected during preventive visits are also the starting point for condition-based decisions.
Why it reduces downtime
- Wear is caught early. A dirty coil or a worn belt found during a visit is a short job; the same problem found after a failure can mean a longer repair and a damaged component.
- Stops are planned. Work happens at a time you choose, not in the middle of peak use.
- Parts are ready. Planned work lets you order consumables and parts before the visit.
- Checks are consistent. A checklist makes every technician look at the same points in the same way.
- Readings show trends. Recording values such as temperatures, pressures or currents against an acceptable range shows when equipment is moving towards a fault.
- Defects get followed up. Problems found on a visit become their own jobs instead of notes that are forgotten.
What a working PPM programme needs
- An asset register with each unit, its location and its maintenance history.
- Sensible frequencies based on the manufacturer’s recommendations, how hard the equipment is used and how critical it is.
- Checklists with acceptable ranges for readings, and photos where evidence is needed.
- Jobs created ahead of the due date, so visits can be scheduled and technicians prepared.
- A rule for defects: which ones are fixed on the spot and which need a separate quotation or approval.
- Reports that the building owner or client can see and acknowledge.
Common pitfalls
- Too many tasks. Checklists that try to cover everything get rushed. Focus on the points that actually predict failures.
- PPM on paper. Paper sheets are hard to check, easy to fill in after the fact and never show trends.
- Results that nobody reads. A reading outside its range that does not trigger any action is wasted effort.
- Intervals that never change. Review frequencies when equipment keeps failing between visits, or when visits keep finding nothing.
How to tell whether it is working
Track a few simple measures over time: PPM compliance (the share of scheduled visits completed on time), the number of breakdowns on equipment covered by PPM, and how long equipment is out of service when it does fail. Many teams also follow mean time between failures (MTBF) and mean time to repair (MTTR) for critical assets. If compliance is high but breakdowns do not fall, the checklists or the intervals need another look.